Westport Facilities Feasibility Study
©Westport Facilities Feasibility Study
Following the construction of a new high school in the Town of Westport, Massachusetts, the existing 155,000-square-foot facility was left partially vacant, resulting in annual maintenance costs of nearly $400,000. RGB Architects was retained to provide comprehensive architectural and engineering services for a feasibility study aimed at consolidating multiple municipal services and identifying additional public and private opportunities that would allow the Town to fully leverage the size, durability, and long-term value of the 70-year-old structure.
The study evaluated a range of considerations related to the building’s reuse and culminated in the development of three programmatic design options for the Town: adaptive reuse of the existing facility; creation of a “community campus” by subdividing the building into three separate facilities; and construction of an addition to the existing Town Hall.