University of RI Bressler Hall All-Gender Restrooms and Flooring

©

University of RI Bressler Hall All-Gender Restrooms and Flooring

Bressler Hall is a four-story, 185-bed residence hall constructed in 1948. Each residential floor contains two multi-stalled communal restrooms, totaling eight shared facilities serving the building. RGB provided design and engineering services for a comprehensive renovation of the toilet and shower facilities on multiple levels, along with replacement of flooring throughout the building. A plumbing code study was conducted to evaluate current fixture count requirements relative to the original 1948 design and present-day occupancy standards.

The renovation enhances the overall student experience while bringing the facilities into compliance with current building codes and ADA/ANSI accessibility standards. The first-floor restrooms were designed to be fully ADA/ANSI compliant; due to the absence of an elevator, upper-floor restrooms incorporate accessibility improvements where feasible. The goal of the renovation is to modernize the communal restroom model to meet contemporary expectations for privacy, safety, and durability. All urinals were replaced with toilets, and new individual toilet and shower stalls were designed with full-height partitions, private lockable doors, dedicated ventilation, and improved lighting. Shower compartments include benches or seats where appropriate.

Given the building’s continuous occupancy, the project was carefully phased to allow construction to proceed while maintaining operational restroom capacity for residents. Work was sequenced vertically and horizontally, typically isolating one restroom stack or floor zone at a time, with temporary accommodations and clear wayfinding implemented to minimize disruption. Plumbing, mechanical, and electrical systems were coordinated to enable controlled shutdowns and tie-ins during limited windows, reducing impact on building operations. Flooring replacement was similarly staged to align with restroom construction zones and to maintain safe egress paths at all times.

The project represents a complex renovation effort executed within a highly restricted timeframe. Through detailed preconstruction planning, disciplined cost control, and close coordination with university facilities staff, the team has successfully maintained schedule milestones and budget targets to date. The work has been carefully structured to support a rapid turnaround between phases, ensuring that renovated facilities are returned to service efficiently before subsequent areas are taken offline. The project is currently out to bid and is anticipated to come in on budget.

In addition to code compliance and operational continuity, the project prioritizes energy efficiency and sustainability through the use of low-flow plumbing fixtures, high-efficiency lighting, improved ventilation systems, and durable, low-maintenance materials. The building-wide installation of resilient flooring enhances durability, slip resistance, and lifecycle performance while contributing to a cohesive interior environment. Collectively, these improvements modernize Bressler Hall’s shared facilities, extend the life of the building, and align the residence hall with

Client

University of Rhode Island

Location

Kingston, RI

Cost

$4,000,000

Services

Architecture