Rhode Island Fire Training Academy
©Rhode Island Fire Training Academy
RGB was commissioned to design the new Rhode Island Fire Academy headquarters in three phases. Phase I consisted of a 3,550 SF burn building with a training tower and other props to assist firefighters in training, as well as a 15,000 SF training pad and vehicle parking area, in addition to an apparatus storage building. Also as part of the scope included sanitary disposal system, storm water control, fire fighting water system, domestic water, propane fuel, electric, telephone and data service. A training pad approximately 400 ft. x 390 ft. that contains a training facility, site props (car fire, flowing fuel fire, and propane tank fire), driver training course and a fire pump control building.
Phase II included an 8,200 SF fire academy headquarters with classrooms, and an office building. The academy building consisted of a 7,500 SF new construction which was added adjacent to the two-bay apparatus building. The academy building houses two 2,100 SF classrooms, conference room, reception area, offices, break rooms, toilet rooms and lockers for men and women.
Phase III involves an addition to the existing Training Academy for auditorium and classroom space, a new free standing metal fire station building within the grounds of the Training Academy, and a new free standing metal storage building located at the Urban Search and Rescue area. RGB will assist the State and State legal team in the approval process related to the State Planning Council and meetings with the Town of Exeter Zoning Board.












