RGB designed a new salt storage facility with a fabric roof system at the Roosevelt Avenue stockpile area. The shed stores 1,500 tons of salt with a 20×25 foot outside door. RGB was able to minimize disruption to the existing maintenance operations during the construction of the new salt shed. Tasks included, but were not limited to:
›Generating schematic level drawings depicting the size and appearance from the highway for approvals
›Production of bidding documents capable of achieving a building permit and competitive bids
›Attendance at the prebid conference to answer questions during the bidding duration
›Construction administration including site visits and field reports of progress ›Review payment requisitions and change orders or credits that apply
›Permitting support services which included conducting studies, preparing documents/reports, and developing technical memorandums to determine State and Federal environmental approvals and permits
›Coordination with RIDOT storm water on permitting/approvals
›Geo-technical analysis
›Prepared a storm water consideration report
›Site evaluation and planning
›Field review/inspection to establish full existing conditions of drainage, curbing, utilities, storm water, and environmental concerns